Charlotte Douglas International Airport American Airline Maintenance Hangar Expansion

Charlotte, NC

We Are Building

This 10,773 sf addition to the existing steel frame hangar features a toolbox storage room, locker room and truck access around the building. It includes new roofing, sprinklers, steel bar joints and steel deck framing. This project also features a renovation of the existing office space, as well as a 576 sf second floor addition that will be used as a training room. A new entry to the facility was also added to ensure quick maintenance access.

Features and Facts

Situated on a fully operational airfield, Messer coordinated extensively with airport to ensure no disruptions to daily operations. Messer also utilized Lean management tools to track subcontractor progress and as a result, the project was finished on schedule.


Assignment: Construction Manager

Architect: Baker LPA Architects, P.C.

Structural Engineer: Case Consulting

Mechanical Engineer: Buford Goff & Associates

Civil Engineer: Baker LPA Architects, P.C.