Metropolitan Nashville Airport Authority BNA/MRO Hangar Development Project

Nashville, TN

Messer was selected based on our proposed sprint start approach to commence work and meet the airport’s aggressive schedule.

All work had to be complete by June 1st. Lean management tools were used to track subcontractor progress and ensure we met this critical deadline. Virtual Design and Construction coordination was a critical tool for above ceiling installation to be ready as soon as steel construction was complete. In an effort to reduce the cost of the fire suppression system, a shared fire pump house was designed and built to accommodate the needs of both hangars. 

Description

  • AGC of Tennessee Award of Excellence in New construction under $50M – Metropolitan Nashville Airport Authority BNA/MRO Hangar Development Project (2017)

  • 90,000 sf airplane maintenance hangar

  • New concrete apron and taxiway to existing airfield

  • Building space includes main hangar bay, parts storage, shop space, training rooms, locker rooms, break rooms and offices

  • Exceeded our 20% S/M/WBE requirement established for this project with an actual achieved participation of 40% S/M/WBE