Atrium Health Cleveland Chiller Replacement and CEP Addition
Charlotte, NC
We Are Building
This project included the replacements of two centrifugal chillers with one new 1200-ton chiller, existing chilled water pumps, condenser water pumps, heat exchanger, controls, and cooling tower. There was also a 400 sf addition to the side of the existing chiller plant, housing new switchgear, distribution cabinets and Variable Frequency Drives.
Features and Facts
Two projects were performed simultaneously to save time and money with fewer shutdowns.
Assignment: Construction Manager
Architect: McMillan Pazdan Smith
Mechanical Engineer: Leach Wallace and Associates
Civil Engineer: Bloc Design
Structural Engineer: Fitzpatrick Engineering (chiller) / Laurene, Richer & Sorrell (CEP)