Alkermes Fill Line 6 Expansion
Wilmington, OH
We Are Building
This 30,000 sf expansion features a new sterile aseptic filling line, a dry process room and interior connecting corridors and airlocks. The project also incorporates an expansion of campus utilities including plant steam, clean steam, RO/RI, WFI, process cooling, and building chilled water.
Features and Facts
Detailed coordination before the installation of process piping, chill water system, compressed air system, and WFI piping was imperative while operations continued in the existing facility.
Assignment: Design-Build Construction Manager
Architect: BHDP Architecture
Structural Engineer: Schaefer
Mechanical Engineer: Pater Engineering Associates
Civil Engineer: Bayer Becker