East Side Medical Office Building – Cincinnati Children’s Hospital Medical Center (CCHMC)
Cincinnati, OH
Features
- Due to our commitment to diversity and economic inclusion, Messer is on track to achieve 30% M/WBE participation.
- Flow scheduling is helping enhance speed to market by completing repetitive building elements productively and efficiently.
- Messer used Value Engineering to decrease cost by taking the building from three stories to two, and increasing the size of the second floor.
- Large sections of the exterior wall were prefabricated for quick installation. There were also 10-foot sections of pipes that were prefabricated.