Aerial photo of airplane hangars

Metropolitan Nashville Airport Authority JWN Hangar Redevelopment

Nashville, TN

Details

  • Assignment: Design-Build
  • Architect: Garver
  • Mechanical Engineer: Garver
  • Structural Engineer: Logan Patri
  • Civil Engineer: Barge Cauthen

Description

In March 2020, John C. Tune Airport was devastated by an ED-2 tornado which damaged or destroyed 17 hangars. MNAA developed a new master plan, which includes 12 new T-hangar buildings with 78 bays; four box hangar buildings with 12 bays; two shade port buildings with 10 bays; a new maintenance facility and parking lot; a new entrance road; and new apron expansions and pavement rehabilitation.

Features

  • Flow Scheduling is being used on the entire project from the foundation to demolition and electrical installation inside the hangars.

Other Projects in Our Region