Nashville International Airport (BNA) Terminal Garage and Airport Administration Building

Nashville International Airport (BNA) Terminal Garage and Airport Administration Building

Details

  • Assignment: Design-Build Construction Manager
  • Architect: Moody Nolan
  • Engineer: EMC
  • Mechanical Engineer: IC Thomasson
  • Civil Engineer: Barge Cauthen

Description

Construction included the demolition and removal of the existing garage and pedestrian walkway with the addition of a new parking garage, 64,000 sf airport administration building, and a large pedestrian plaza that consists of landscaping, water features, outdoor seating and public art.

Features

  • Maintaining pedestrian access from the terminal to the CONRAC required covered pedestrian tunnels with signage and wayfinding. In order to get the garage up-and-running as soon as possible, our team developed a plan to open the garage to the public prior to the completion of the administration building.
  • The administration building is designed to meet LEED Silver and the garage is designed to meet ParkSmart Bronze level certification.