Messer project image

New Production Line – Procter & Gamble

Greensboro, NC

Details

  • Assignment: Construction Manager
  • Architect and Structural Engineer: Salas O'Brien
  • Mechanical Engineer: Jacobs
  • Electrical Engineer: Dennmark

Description

Includes the relocation of two secondary packing lines, rebuild of overhead canister conveyors and installation of a new prefabricated making system to enhance production. Also includes the expansion and modification of utilities (steam, power, compressed air, sewer, water, HVAC, and natural gas) to support new equipment. The addition of the new packing line in the vacated space requires overhead conveyor reconfiguration.

Features

Other Projects in Our Region

  • Terminal 2 Concession Spaces – Raleigh Durham International Airport

    View project
  • Fort Bragg Special Operations Forces (SOF) Group Headquarters

    View project
  • Nelson Hall Ground Floor Renovation – North Carolina State University

    View project
  • Bingham Hall Renovation – UNC Chapel Hill

    View project
  • aerial photo of two under-construction industrial buildings

    Eagle Crest Industrial Property Building 1 and 2 – DCI

    View project
  • Raleigh-Durham International Airport Concession Spaces Program-Phase 1

    View project