- Renovation of the existing structure required the design‑build team to implement efficient solutions for significant foundation repairs, including 400 linear feet of underpinning, new shear walls, and reinforcement of existing beams and slabs.
- Out team leveraged BIM to resolve MEP coordination challenges created by tall ceiling design, reducing costs and increasing schedule reliability prior to construction.
- This building ties into the Western Campus Geothermal plant, enabling a projected 50% reduction in energy consumption while significantly enhancing comfort and climate control.