Lab Renovation Phase I - Expression Therapeutics
West Chester, OH
Features
- Modular PODS were constructed off site for the facility’s cleanrooms to accelerate the buildout.
- The project began during the height of the COVID-19 pandemic when material lead times and costs were rapidly increasing. Despite these challenges, Messer delivered the project on-time and within budget.
- Building Information Modeling (BIM) enabled our team to virtually model the mechanical, electrical and plumbing systems prior to construction, ultimately reducing cost and ensuring the reliability of the construction schedule.
- Check out this article in BioProcess International co-writted by Eric Davis (Project Executive), Expression Therapeutics, CBRE Heery, and G-CON Manufacturing, Inc – Facing a Unique Challenge: Building an In-House Cell and Gene Therapy Manufacturing Facility During the Pandemic