
Rutherford County Teaching Addition – Motlow State Community College
Smyrna, TN
Features
- The project includes numerous sustainable features, such as
geothermal heating and cooling systems. - Flow Scheduling was utilized to break the project into similarly sized areas and determine the best sequences, allowing for faster dry-in of critical areas.
- We achieved 15.21% minority-and-women-owned-business-enterprise (M/WBE) inclusion.
- Through the use of Value Analysis, Messer was able to eliminate one of two elevators by increasing size of planned “passenger” elevator to accommodate large equipment for labs located on upper levels of the building.